Sr. No. Year of Completion Contract Value Client Contractor/Sub-Contractor Contract Name & Brief Description of Work in Execution Status
1 2018 28,665,740 K-Electric Contractor Relocation of 132kV KDA/FEDERAL.B and 132kV FEDERAL.B/VALIKA OHTL Circuit at Nagan Chowrangi Completed
2 2018 954140190 PEL-TAIKAI JV Contractor 132kV/ 220kV Substation at Dera Murad Jamali In Progress
3 2018 64698000 DESCON Contractor 132kV AIS Grid Station Sanjar Pur Sadiqabad A/W Transmission Line In Progress
4 2018 90302000 DESCON Contractor 132kV AIS Grid Station Choti In Progress
5 2018 21801206 DGW&CE (Army) Contractor Construction of 8X Sldrs Flats (G+3) Block#1, Qureshi Line-HQ 8 Div at Sik. In Progress
6 2018 21807920 DGW&CE (Army) Contractor Construction of 8X Sldrs Flats (G+3) Block#2, Ghufran Shah Line-HQ 15 Div at Sik. In Progress
7 In Hand 312,877,149 K-Electric Contractor Reinforcement (Replacement of Conductor) of existing 132kV overhead Double Circuit T/L Baldia-Hub & Baldia-Tapal & Tapal-Hub CKT In Progress
8 In Hand 491,043,918 K-Electric Contractor 132kv Overhead T/L Looping IN/OUT Dhabeji–Gharo circuit for 132kv Oursun (35MW) Power Plant Installation, Erection, Testing, commissioning and Energization on Turnkey Basics In Progress
9 In Hand 4,563,000 K-Electric Contractor Procurement of Tower Step Bolts on 132kV & 220kV Overhead Transmission Line. In Progress
10 In Hand 4,260,601 K-Electric Contractor Procurement of STP 52”. CIB 33” and 42” With Complete Fittings In Progress
11 In Hand 331,304,285  LSN & Sean Consortium KOREA/NTDC Contractor Construction of 132KV SDT Larkana-III-Mehar-Dadu T/ Lines In Progress
12 In Hand 6,000,000 K-Electric Contractor Service Contract for Maintenance of OPGW/FOC of K.E Telecom Fiber Optic In Progress
13 In Hand 3,484,716 K-Electric Contractor Services Required for Replacement of Monopole Step Ladder on 220kV & 132kV Overhead Transmission Line. In Progress
14 In Hand 69,299,780 Technomen Kinetics Contractor Rehabilitation of Rusted Towers of 220kV BQPS # Pipri Double Circuit Transmission Lines. In Progress
17 In Hand 2,065,301 K-Electric Contractor Service for Installation of CU Welded Earth Wire 150mm2 on 220kV BQPS-Pipri Ckt-1 & 2 and 220kV BQPS-Pipri Circuit-3, 220kV BQPS-ICI, 220kV ICI-Pipri (Common Towers). In Progress
18 In Hand 24,486,102 K-Electric Contractor Procurement of OPGW Fiber Links (Material/ Services) In Progress
Total   1,510,711,161 TOTAL VALUE OF WORK EXECUTTION IN 2017 & 2018
WORKS EXECUTED IN  2017
Sr. No. Year of Completion Contract Value Client Contractor/Sub-Contractor Contract Name & Brief Description of Work in Execution Status
1 2017 5,560,730 K-Electric Contractor Replacement of 132kV Gharo Grid Gantry RCC Structure (Karachi) Completed
2 2017 16,105,920 K-Electric Contractor Service for Replacement of Disc Insulator Strings at 220kV KDA Pipri Circuit I & II Completed
3 2017 13,572,840 K-Electric Contractor Service for Replacement of Disc Insulator Strings at 220kV BQPS-KCR Circuit I & II Completed
4 2017 136,617,915 K-Electric Contractor 132kV Overhead Transmission Line Looping In/ Out BOC-Dhabeji Circuit for 132kV FFBL Grid Station Design, Engineering, Survey, Supply, Installation, Erection, Testing, Commissioning & Energization on Turnkey Basis. Completed
5 2017 34,444,568 K-Electric Contractor Tower Replacement for 66kV Vinder Uthal Bela Line Completed
6 2017 15,161,076 K-Electric Contractor Hiring Services for Replacement of Cross Arms in 1st Phase for Trans-OH of Tension Tower/Gantries of 220kV BQPS 1-Pipri Ckt I & II. Completed
9 2017 370,092,553 Technomen Kinetics Contractor 32kV Double Circuit Transmission Line from Nooriabad 100MW Power Plant to KDA Scheme 33 K-Electric Sub Station Karachi. Completed
10 2017 23,030,250 K-Electric Contractor Tower Replacement for 132kV Baldia-Kanup Line Completed
2017 31,267,774 K-Electric Contractor Supply & Services for Replacement of Cross Arms of 132kV Korangi Town-Pipri & 132kV Kepz-Pipri. Completed
11 2017 10,183,105 K-Electric Contractor Painting of 220kV EHT Towers Completed
12 2017 166,110 K-Electric Contractor Service for Installation of CU. Welded Earthwire 150 mm2 Kanupp Gantry to T#8 on 132kV Baldia-Kanupp T/E Completed
Total      656,202,841 TOTAL VALUE OF WORK EXECUTED IN  2017
WORKS EXECUTED IN  2017
Sr. No. Year of Completion Contract Value Client Contractor/Sub-Contractor Contract Name & Brief Description of Work in Execution Status
1 In Hand 61,613,268 DW & CE.SPD Contractor Construction of GMC Type A at Quad Gar – Re-appropriation a fund Pri list Fy 2010-11
to 2014-15 Phase II.
Completed
2 2017   222,096,606 Technomen Kinetics Sub-Contractor 132KV Double Circuit T/Line from Nooriabad to KDA Scheme 33 Karachi Completed
3 2017    77,668,128 HESCO/CCC Sub-Contractor Procurement of Plant, Design, Supply, Installation and Testing & Commissiong of one (1) Nos. Conversion from 66 KV to 132KV (AIS) Grid station at Tando Ghulam Ali along with Allied T/L Completed
4 2017   136,617,915 K-Electric Contractor 132KV Transmission Line at Fauji Foundation Bin Qasim plant Completed
5 2017    13,572,840 K-Electric Contractor Service for Replacement of Disc Insulator Strings at 220 KV BQPS-KCR Circuit I and II Completed
6 2017      5,560,730 K-Electric Contractor Services required for replacement of 132kv Cemented Gantry Structure via steel lattic structure at Gharo Grid. Completed
7 2017    38,444,568 K-Electric Contractor Tower Replcement for 66kv Vinder Uthal Bela Line Completed
8 2017    23,030,250 K-Electric Contractor Tower replacement for 132kv Baldia Kanupp Tower# 3,4,5,6,7,8 Completed
9 2017    31,267,744 K-Electric Contractor Supply and services for replacement of Cross arms of 132 kV Korangi Town-Pipri & 132 kV KEPZ Pipri. Completed
10 2017    16,105,920 K-Electric Contractor Supply and services for replacement of Disc Insulator Strings with  complete fittings/Hardware at 220kv KDA Pipri west CKT 1&2 Completed
11 2017    13,060,268 K-Electric Contractor Installation of Cross Arm Of 220KV Tower Completed
Total Value    577,424,969 Total Value of work Executed in 2017
WORKS EXECUTED IN  2016
Sr. No. Year of Completion Contract Value Client Contractor/Sub-Contractor Contract Name & Brief Description of Work in Execution Status
1 2016          93,729,836 PEL / NTDC Sub-Contractor Supply & Construction of Civil works of 132 KV(AIS) Grid Station on Turnkey Basis at Faqirwali & Fort Abbas (MEPCO) Completed
2 2016          14,069,792 K-Electric Contractor Hiring Services & Replacement of Compression Dead End Clamp at 220KV
Baldia-Maripur CKt 1 and 2 for Transmission OH.
Completed
3 2016            8,727,336 K-Electric Contractor Repair / Replacement / Reconstruction of Stubs / Main members 5 Nos of
Towers (Tower No. 19, 20, 21, 22, 23) of 132 KV PRL-Korangi west
Completed
4 2016            3,355,202 K-Electric Contractor Supply/Erection of 01 Nos. of tower of 132 KV Baldia-Tapal-Hub Double circuit T/L Tender reference LPO/PP/447/14 Completed
5 2016          52,109,140 DHA Sub-Contractor Supply & Construction of Civil works (including all survey works), Erection /Installation , Testing and Commissiong for underground External Electrification and street light system of sector (Extension-I & II) DHA phase VI Lahore Completed
6 2016        106,563,918 PEL Sub-Contractor Laying Of 11 Kv Underground Cable & Allied Civil & Electrical Works At DHA Lahore Completed
7 2016            3,028,300 K-Electric Contractor Service required for Re- Spolling of 70 drum  of copper Conductor 300 mm2 at baldia Completed
8 2016            8,478,240 K-Electric Contractor Supply & Installation of 132KV OH Tower Step Bolts Completed
9 2016            1,824,000 K-Electric Contractor Rehablitation of Tower # 64 of 132kv KDA Maymmar T/L Completed
10 2016          13,447,118  LSN & Sean Consortium KOREA/NTDC Sub-Contractor Installation of Gantries at Bahria Town Completed
Total      305,332,882 TOTAL VALUE OF WORK EXECUTED IN  2016
WORKS UNDER EXECUTION (2017-2018)
Sr. No. Year of Completion Contract Value Client Contractor/Sub-Contractor Contract Name & Brief Description of Work in Execution Status
1 In Hand 498,391,050 PEL – TAIKAI Sub-Contractor 132 / 220KV Sub Station at Dera Murad Jamali Under Execution
2 In Hand 271,939,591 NEIE/Nespak Sub-Contractor In Out Arrangrment of 500 kv Guddu -Mulatan 3rd Circuit at Rahim Yar Khan 500 kv Substation Under Execution
3 In Hand 43,609,126 DW & CE.SPD Contractor Construction of 8* Sldrs Flats (G+3) Block No. 1 Qureshi Line-HQ 8 DIV & Block No. 2 Ghufran Shah Line-HQ 15 DIV at Sialkot Under Execution
4 In Hand 30,345,085 Master City PVT Ltd Contractor Instalaltion, Testing & Commissioning of Underground External Electrification in Block A & B at Master City Gujranwala Under Execution
5 In Hand 26,000,000 NTDC/ NEIE Sub-Contractor Thar Mithyari Tower Erection 500kV NEIE Under Execution
6 In Hand 331,304,285  LSN & Sean Consortium KOREA/NTDC Sub-Contractor 132 Kv Overhead Transmission Line Larkana – Dadu – Mehr (Sindh) Hesco 08 Under Execution
7 In Hand 155,000,000 DESCON Sub-Contractor 132kV AIS Grid Station Choti & Sanjarpur Sadiqabad a/w T/L Under Execution
8 In Hand 466,625,742 K-Electric Contractor 132KV OVERHEAD T/L LOOPING IN/OUT Dhabeji-Gharo Circuit For 132kV Oursun (35MW) Power Plant. Design, Engineering, Survey, Supply, Installation, Erection, Testing, Commissioning and Energization on TURNKEY Basis Under Execution
9 In Hand 291,296,950 SPTD Sub-Contractor Rehabilitation Work for Projects TP -1000-02 / FWP -15 Under Execution
10 In Hand 242,476,440 Orient Enegy Sysytem Pvt.Ltd Sub-Contractor TP-1000-02 Construction Contract 132kv Overhead Transmission Line Under Execution
11 In Hand 69,299,780 K-Electric Contractor Rehabilitation of Rusted Towers of 220 KV BQPS # Pipri Double Circuit T/Lines Under Execution
12 In Hand 10,183,105 K-Electric Contractor Painting of 220 KV EHT Towers Under Execution
13 In Hand 6,000,000 K-Electric Contractor Service contract for OPGW/FOC Maintainence contract of KE Telecon Fiber Optic Network. Under Execution
14 In Hand 2,065,301 K-Electric Contractor Supply & Services for installation of Cu Welded Earthwire conductor on 220kv BQPS -PIPRI Ckt 1 & 2 (Common Tower) and 220KV BQPS-PIPRI Ckt-3, 220KV BQPS-ICI-PIPRI (Common Towers) Under Execution
15 In Hand 19,986,492 K-Electric Contractor Supply & Installation of DEAD END CLAMPS-170 & 171 Under Execution
16 In Hand 20,189,510 K-Electric Contractor Supply for replacement of compression Dead End Clamp at 220kv BQPS-PIPRI-WEST CKT 3 and BQPS-ICI-PIPRI WEST CKT-4 Under Execution
17 In Hand 26,137,898 K-Electric Contractor Hiring services for Replacement of DEBs of Tension Tower /Gantries of 220kv BQPS 1 PIPRI ckt and Cross arms in 1st Phase for T/L Under Execution
18 In Hand K-Electric Contractor Replacement/Services required for Monopole at Location# 16(N) Of 132KV Haroonabad– Maripur Ckt – 1 & 2 Under Execution
19 In Hand 4,563,000 K-Electric Contractor Procurement of Tower Step Bolts Under Execution
20 In Hand 11,244,584 K-Electric Contractor Installation of Underground Feeders Under Execution
21 In Hand 16,146,702 K-Electric Contractor Supply & Services of OPGW Fiber Links (Material / Services) Under Execution
22 In Hand 304,645,209 K-Electric Contractor Reinforcement (Replacement of Conductor & Hardware) of existing 132kV Overhead    Double Circuit T/L Baldia–Hub and Baldia-Tapal and Tapal – Hub Circuits Under Execution
23 In Hand 28,665,740 K-Electric Contractor Relocation of 132kV KDA/Fderal.B & 132kV Feederal.B/Valika OHTL Circuit at Nagan Chowrangi Under Execution
TOTAL 2,876,115,590 TOTAL VALUE OF WORK UNDER EXECUTION

Year 2014

Client Description Contract Value Details
KESC Laying of 11 KV underground Cable works at different areas of Karachi. 4,585,620 Details
KESC 132 KV D/C Overhead T/Line for Clifton Grid Station 158,983,869 Details
KESC Rehabilitation of 11KV Overhead / Underground Transaction Line at Baba-Bhit Islands Karachi 43,701,665 Details
SIEMENS 132 KV TALHAR GRID STATION (HESCO 10) 16,803,407 Details
SIEMENS 132 KV LARKANA, SUKKUR & JACOBABAD GRID STATIONS (HESCO 7) 171,200,372 Details
KESC CONSTRUCTION, ERECTION, STRINGING AND COMMISSIONING OF 11 KV TRANSMISSION LINE FOR SHAMS PEER ISLAND 8,000,000 Details
K – Electric Replacement of cross arms between tower no 90 to tower no,103 AT 132 KV Baldia – Valika – Orangi transmission line 8,500,000 Details
K – Electric Re spooling of cu. conductor 400mm 900,000 Details
K – Electric Re spooling of cu. conductor 300mm 931,500 Details
US AID Supply, Delivery & Installation of 11 KV Switch Gear incoming Panels (EPP Task Order # AID-391-TO-12-00002) 27,234,954 Details
Total Value for the Completed Projects in 2014

440,841,387

 

Year 2013

Client Description Contract Value Details
KESC Laying of 11 KV underground Cable works at different areas of Karachi. 9,856,445 Details
KESC Rehabilitation of OPGW for Different Lines 2,963,050 Details
KESC Replacement of Nuts & Bolts for 220Kv BQPS – KCR T/Line 2,249,996 Details
KESC Rehabilitation of Span Conductor to Meet the rated Capacity at 220 BQPS 2 – KCR CKT 1 & 2 2,250,000 Details
KESC Cleaning of Insulator for 132 KV KNPC-BALDIA Circuit 1 & 2, 220 KV BALDIA – MARIPUR Circuit 1 2,385,470 Details
KESC 220 KV S/C Overhead T/Line for Baldia – Maripur 58,612,444 Details
NTDC / MECON 220 KV T/LINE from Qabu Saeed Khan to Khuzdar (Complete Job) 140,250,000 Details
KESC HORIZONTAL BORING AND LAYING OF 11 Kv CABLE FEEDERS 13,870,500 Details
Total Value for the Completed Projects in 2013 232,437,905

Year 2012

Client Description Contract Value Details
KESC Sorting / Segrigation of Assembly Fitting & Hardware at KESC’s KDA Store 1,863,223 Details
KESC Cleaning of Insulator String at 220 KV KCR – LALAZAR & KCR – KPT T/Line 628,515 Details
KESC 132 KV T/Line at Gulistan – e – Jouhar for Hospital Grid 57,580,968 Details
Saita Pak Civil Earthwork at Tajjal & East fill concession area for ENI at Kadan wadi Distt Khairpur for oil exploration project 112,500,000 Details
Seimens Supply & Installation of 132KV High Voltage Bus Bar at Agha Steel Bin Qasim Karachi 2,987,480 Details
NTDC / NEIE 220 KV T/LINE at Pattan – Besham (Foundation Work) 21,456,000 Details
NTDC / NEIE 220 KV T/LINE at Pattan – Besham (Erection Work) 10,564,000 Details
NTDC / NEIE 220 KV T/LINE at Pattan – Besham (Stringing Work) 10,525,000 Details
KESC Rehabilitation 220 KV KDA – Pipri Circuit 2 location # 12 & 13 225,000 Details
KESC Installation of PMT at different locations in KARACHI. 2,365,000 Details
Total Value for the Completed Projects in 2012 220,695,186

Year 2011

Client Description Contract Value Details
KESC Laying of 11 KV underground Cable works at different areas of Karachi. 18,575,065 Details
NTDC / KESC Design, Supply (Partially) Erection, Testing, & Comissioning of 132 KV D/C O/H T/L with OPGW from Sea Shore KTPS to 132 KV Switch Yard Building. 29,337,514 Details
KARKEY Construction of Foundation, Erection & Stringing work of KPS T#1 at KTPS 18,068,775 Details
DHA Bush Cutting Work at DHA Phase VIII Karachi 7,479,660 Details
DHA Repair of Damaged Fiber Optic Cable Laid Between KESC Qayyumabad Grid & DHA Grid No. 1 Phase VIII 475,000 Details
Space Settlers Commercial building at Bahadur abad Karachi 117,565,000 Details
KESC Break down work for 132 KV BOC – PIPRI Transmission Line 670,918 Details
Total Value for the Completed Projects in 2011 192,171,932

Year 2010

Client Description Contract Value Details
KESC Replacement of Hardware for 06 Nos. Transmission Lines at Karachi 3,673,629 Details
KESC 132 KV Transmission Line Korangi Town – Baloch Colony – Korangi West 30,061,295 Details
KESC Cleaning of Insulator for 07 Nos. 220 KV Transmission Line 1,585,000 Details
KESC Repair work at tower 220 KVBQPS-Pipri West Circuit II 169,940 Details
KESC Re-Routing of 07 Nos. Towers for Under Construction Bridge at Banaras Chowk 46,209,940 Details
KESC Supply of Jumper Termination, PG clamps, & T Connectors Bronze 208,104 Details
KESC Construction of Collapsed Tower at Hub Baluchistan 3,750,000 Details
DHA CITY Establishment of Mechanical Lab at DHA City office Karachi 183,750 Details
DHA CITY Establishment of Research Cell at DHA City office Karachi 1,914,037 Details
LS CABLE / KESC Design, Manufacture, Supply, Erection, Testing & Commissioning of 132KV D/C T/L Between KTPS to Qayyumabad Grid Station 112,579,152 Details
KESC Listing of transmission Line Material 320,000 Details
KESC OPGW for 16 Nos. Fibers, Including Approach Cable FOC with End to End testing. 1,900,000 Details
KESC Inst. Of Foundation, Erection & Stringing of Pole at Korangi Baloch Line 3,999,975 Details
Total Value for the Completed Projects in 2010 206,554,822

Year 2009

Client Description Contract Value Details
KESC Replacement of Insulators for 132KV Kanupp – Baldia line Karachi 7,299,867 Details
KESC Repairing of 132 KV Transmission line Fault at Karachi 889,060 Details
KESC / NEIE 132 KV Transmission line Hybrid Project at Karachi (04 Lines) 139,560,000 Details
KESC Transmission Line, feeding PRL Mobil Grid Station. 299,999 Details
KESC Replacement of OPGW & Splicing of 2 way Joint Box 452,250 Details
KESC / NEIE Rectificatiion of Existing Tower 580,000 Details
KESC Rehabilitation of 220 KV line BQPS-KCR ckt – 1 365,000 Details
KESC Rehabilitation of 220 KV Lalazar – Maripur ckt-1 (I) 985,000 Details
KESC Repairing of Optical Fibre Ground Wire for KESC 5,483,900 Details
KESC Transmission line yellow & Red phase Conductor & X-arms replaced 340,000 Details
KESC Rehabilitation of 220 KV Lalazar – Maripur ckt-1 (II) 560,000 Details
GAC Residential Building Namely Al-Amna Terrace, GRW 139 Garden West Karachi 83,375,000 Details
Total Value for the Completed Projects in 2009 240,190,076

Year 2008

Client Description Contract Value Details
NTDC / NEIE 220 KV Tower Foundation work at Bata Gram Mansehra (11 Sites) 11,350,000 Details
KESC 132 KV T/Lines at S.I.T.E Gas Turbine Karachi 7,385,264 Details
KESC 11 KV U/G Cable laying work at Gulistan-e-Johar Karachi (37 Scheme) 5,365,000 Details
KESC Rehabilitation / Stringing work for Korangi South Loop line karachi 1,995,000 Details
NTDC / NEIE 220 KV Tower Stringing work at Besham (18 Sites) 2,550,000 Details
KESC 11 KV U/G Cable laying work at different locations Karachi (03 Scheme) 1,746,500 Details
KESC 11 KV U/G Cable laying work at different locations Karachi (11 Scheme) 2,150,000 Details
KESC 11 KV U/G Cable laying work at different locations Karachi (08 scheme) 3,560,000 Details
KESC Modification work on PLDP at Qayyumabad 85,000 Details
KESC 11 KV U/G Cable laying work at different locations Karachi (09 Scheme) 2,650,000 Details
GAC Residential Building Namely Ameena Terrace, GRW 147 Garden West Karachi 66,025,000 Details
KESC 11 KV U/G Cable laying work at different locations Karachi (16 Scheme) 3,626,000 Details
PRIMACO Renovation work of EOBI Offices at different locations countrywide 6,785,000 Details
KESC 11 KV U/G Cable laying work at different locations Karachi (09 Scheme) 3,850,000 Details
KESC 11 KV U/G cable laying work at Korangi Karachi (77 Scheme) 14,565,600 Details
Total Value for the Completed Projects in 2008 133,688,364

Year 2007

Client Description Contract Value Details
PARCO Brick Soling & Concrete Flooring with SR Cement at MCR 14,213,700 Details
IIC / WARID Warid Telecom tower on CAME Basis at LAHORE Region (10 Sites) 13,000,000 Details
NTDC / NHC 500 KV Over Head T/ Line Muzaffar Garh – Gatti Foundation work 18,700,000 Details
KESC 11 KV U/G Cable laying work at Gulshan-e-Iqbal (07 Schemes) 8,725,000 Details
KESC 11 KV U/G Cable laying work at Old Town (43 Schemes) 14,520,000 Details
NTDC / NEIE 220 KV Tower Foundation work at THAKOT MANSEHRA (10 Sites) 17,250,000 Details
LEBLANC CM Pak Telecom Towers Electric work only (14 Sites) 4,750,000 Details
NTDC / NEIE 220 KV Tower Foundation work at Besham (18 Sites) 29,560,000 Details
KESC 11 KV U/G Cable laying work at North Karachi (29 Schemes) 10,050,000 Details
IIC / CM Pak CM Pak Telecom Towers at BAHAWALPUR & SAHIWAL (28 Sites) 29,400,000 Details
PARCO Roof Treatment of HSE Building at PARCO MCR 875,000 Details
PARCO Civil works for LPG PLANT AT MCR Mehmood Kot 1,356,000 Details
PARCO Civil works for SPOON BASIN AT MCR Mehmood Kot 842,000 Details
NTDC / NEIE 220 KV Tower Erection work at Besham (18 Sites) 3,250,000 Details
NTDC / NHC 500 KV T/ Line Muzaffar Garh – Gatti 914dia Piles & Tie Beams 8,750,000 Details

Upto 2006

Client Description Contract Value Details
KESC LTD Nizva-Lvri 132 KV Transmission Line & Sub Station. Sultanat – e – OMAN 22,000,000 Details
PARCO Construction of Access Road for Sewage Plant at MCR 945,000 Details
PARCO Bituminous Concrete Road along Maggi canal at MCR 755,000 Details
PARCO Construction of Approach Road for Sulfur yard at MCR 1,125,000 Details
PARCO Renovation of MC Camp at Housing Complex MCR 465,000 Details
PARCO Construction of Field Toilet Block in Process area at MCR 842,000 Details
PARCO Modification in Excise & Shipping Building at MCR 1,215,000 Details
PARCO Carpeting of Internal Roads at Korangi PS-1 Karachi 1,875,000 Details
PARCO Repair / Carpeting of Roads outside Korangi PS-1 Karachi 1,250,000 Details
PARCO Rectification of Settled Asphaltic Road Portion at MCR 527,425 Details
PARCO RCC Paving for Access to Satellite Workshop in Area A-700 MCR 665,000 Details
PARCO Repair work at Diesel Laboratory at Mid Country Refinery 2,150,000 Details
PARCO Const. of Card Scanning Machine Facility on Road P at MCR 795,000 Details
PARCO Rectif. of damaged earthen portion of Flare Stack Fondn. at MCR 1,285,000 Details
PARCO Replacement of Damaged False Ceiling in Lab Building at MCR 945,000 Details
PARCO Development work at Korangi PS-1 Karachi 795,000 Details
PARCO Const of Fire Fighting Facility at Sulfur Storage yard MCR 2,550,000 Details
PARCO Const of Store Room near Operator Room in ETP area at MCR 905,000 Details
PARCO Const of Store Room near Operator Room in Utility area at MCR 475,000 Details
PARCO Repair & Maintenance of Open Drain at Korangi PS-1 Karachi 425,000 Details
LASMO PAK Const of Air Strip Distt. Dadu Sindh 7,800,000 Details
PARCO Const of Facilities for Hydro Jetting Station at MCR 3,175,000