| S.No. | Client | Project Title | Agreement No | Contractor/Sub-Contractor | Year | Status |
|---|---|---|---|---|---|---|
| 1 | K-Electric | Services required for the installation-replacement of existing Insulators and STACIR- |
7500049184 (10-11-22) | Contractor | 2023 | Completed |
| 2 | K-Electric | Services required for the installation-replacement of existing insulators and STACIR 132kV Pipri-Korangi Town, 132kV Landhi-Gul Ahmed, 132 kV Gul Ahmed-Korangi Town |
Contractor | 2023 | Completed | |
| 3 | K-Electric | Services are required for the installation, replacement of existing Insulator Strings by composite type Long Rod Insulator strings with complete hardware fittings on both circuits of 132kV Baldia-KANUPP and 132kv Baldia-K2/K3 Circuit, complete in all respects as per the KE requirements from Loe. 21 to 49 =Total 31 locations |
Contractor | 2023 | Completed | |
| 4 | K-Electric | Permanent solution regarding Restoration of collapsed T# 51 of 132kV Baldia-Tapal and Tapal-Hub due to flooding/heavy rainfall. |
Contractor | 2023 | Completed |